Woodland Project Phase 2 Survey Report
Plate 7. |
The two old hedgebanks on the project site (Plan) have been repaired and rebuilt (Plate 7). At the same time, an area adjacent to the hedgebank in the centre of the project site, was deeply cultivated by the digger. This area has been delineated by green posts (Plate 8). This will be separately sampled in future surveys to see what effect, if any, this has on regeneration. |
Plate 8. |
Woodland Project Phase 2 |
||
Results |
||