The Wetlands
Restoration Project

Southern Lake Restoration

Page 2

The Spillway
The construction of the spillway went hand in hand with the construction of the sluice.   The spillway was designed to allow floodwater to escape from the Southern Lake, as well as reduce the erosive effect of the fast moving water by slowing it down.

P27a.jpg (111708 bytes) P27b.jpg (103852 bytes)

Removal of rhododendron to build a spillway to take excess flood water

Surveying the site for the spillway

 

P28a.jpg (101100 bytes) P28b.jpg (104288 bytes)

Construction of the spillway with gabion baskets and geotextile fabric

Footbridge constructed over the spillway


NEXT  wpe44.gif (906 bytes)  

 

 

froganimb.gif (5459 bytes)

WETLANDS PROJECT CONTENTS