The Wetlands Restoration Project
Kingfisher Pond Restoration in Pictures: 2

Kingfisher Pond Spillway

p42a.jpg (86796 bytes)

Armco pipes, geotextile fabric and waterproof membrane installed, followed by Gabion baskets being filled

p42b.jpg (128384 bytes)

Top of spillway coated in concrete prior to final excavation phase of pond.  Note the condition of the track

p42c.jpg (87948 bytes)

Completed pond spillway

NEXT    wpe44.gif (906 bytes) 

   

 

froganimb.gif (5459 bytes)

WETLANDS PROJECT CONTENTS