Four of the five surveys listed below were
conducted in the summer following the completion of restoration work in 1991. These
surveys were walking surveys. In 2000, an extensive ecological survey was carried
out. Both line and belt transects were carried out to show the botanical variety of
the area. The comprehensive results include diagrams, charts and statistical
analysis. It is important to remember that
although restoration was finished by 1991, rhododendron clearance actually started as
early as 1987 in some areas. Therefore by the time of the 1991 surveys some sites were
showing significant natural regeneration, particularly where it was wetter. The dates when
clearance finished is given for each of the areas. |